Soviet Production Costs

Item

Man-Time Needed

Cost

Il-2 Sturmovik (Early)

9,500 Man Hours

UNKNOWN

Il-2 Sturmovik (Late)

5,900 Man Hours

UNKNOWN

T-34 (1941)

8,000 Man Hours

UNKNOWN

T-34 (1943)

3,700 Man Hours

UNKNOWN

Soviet 152mm Howitzer (1941)

4,500 Man Hours

UNKNOWN

Soviet 152mm Howitzer (1943)

2,400 Man Hours

UNKNOWN

1,000 TT Cartridges (early)

13 Man Hours

UNKNOWN

1,000 TT Cartridges (late)

10.8 Man Hours

UNKNOWN

PPSh-41 SMG

7 Man Hours

UNKNOWN

PPD-41 SMG

14 Man Hours

UNKNOWN

The Soviet Economy During the Second World War By Nikola Alekseevich Voznesenski

Average Monthly Wages in the USSR

Industry

1940

1944

Workers in a Union Industry

375 Rubles

573 Rubles

Coal Mining

--

729 Rubles

Steel Industry

--

697 Rubles

Engineering and technical personnel in a union industry

768 Rubles

1,209 Rubles

Engineering and technical personnel in coal mining

--

1,502 Rubles

Engineering and technical personnel in the Steel Industry

--

1,725 Rubles

The Soviet Economy and the Red Army, 1930-1945 By Walter Scott Dunn